Within the Kayseri Bünyan Irrigation Project, GREENHYDRO successfully completed the installation and rehabilitation works of a DN3000 mm GRP (FRP) pipeline. During the project, 970 Lamination applications were performed, and all line sections passed pressure and leak-tightness tests before being commissioned. These works significantly improved the efficiency, reliability and durability of the existing water distribution infrastructure. Through high engineering standards and strong field experience, GREENHYDRO ensured a long-lasting and sustainable irrigation infrastructure.

Project Name

Bünyan Irrigation Project

Partner Company

Kalem İnşaat

Services

GRP (FRP) Pipeline Repair

Project Date

2023

Project Duration

4 Month

Project Location

Bünyan / Kayseri / Türkiye