FAST TRACK WATER TREATMENT PLANT PROJECT

FAST TRACK WATER TREATMENT PLANT PROJECT

FAST TRACK WATER TREATMENT PLANT PROJECT

GREENHYDRO successfully completed the repair and reinforcement works of a 19 km DN1000 mm GRP (FRP) pipeline within the Fast Track Water Treatment Plant Project in Iraq. During the project, 1,900 Lamination applications were performed, eliminating severe water leakages and joint weaknesses on the line. All sections passed comprehensive hydrostatic tests and the system was safely commissioned. As a result of this rehabilitation, the line now provides efficient and reliable water transmission, contributing to the sustainability of the region’s critical infrastructure.

Project Name

Fast Track Water Treatment Plant Project

Partner Company

ENI & Delta River Limited

Services

GRP (FRP) Pipeline Repair

Project Date

2022 - 2023

Project Duration

7 Month

Project Location

Basrah / Iraq