EREĞLİ İVRİZ IRRIGATION PROJECT

EREĞLİ İVRİZ IRRIGATION PROJECT

EREĞLİ İVRİZ IRRIGATION PROJECT

GREENHYDRO successfully completed the reinforcement and repair of DN2800 mm–DN3000 mm GRP (FRP) pipelines within the Ereğli İvriz Irrigation Project using the internal Lamination method. During the project, 228 uniaxial lamination applications were performed and all lines were tested and commissioned without issues. The implemented lamination system made the lines suitable for high-pressure water transmission, enhancing mechanical strength, leak tightness and long-term durability.

Project Name

Ereğli İvriz Irrigation Project

Partner Company

Kolin İnşaat

Services

GRP (FRP) Pipeline Repair

Project Date

2021

Project Duration

2 Month

Project Location

İvriz / Ereğli / Konya / Türkiye

Previous