ÇANKIRI IRRIGATION PROJECT

ÇANKIRI IRRIGATION PROJECT

ÇANKIRI IRRIGATION PROJECT

Within the Çankırı Irrigation Project, GREENHYDRO successfully completed the manufacturing and installation of DN2000 mm GRP (FRP) fittings to rehabilitate the regional water transmission line and enhance system reliability. During the project, 140 fittings (elbows, tees, reducers and flanges) were manufactured and delivered to site. In addition, 80 Lamination applications were carried out at connection points, and the entire system was tested and commissioned. The components were designed for high-pressure environments and tested in accordance with international quality standards.

Project Name

Çankırı Koyunbaba Irrigation Project

Partner Company

Orak İnşaat

Services

GRP (FRP) Fittings Manufacturing & GRP (FRP) Pipeline Repair

Project Date

2023

Project Duration

6 Month

Project Location

Çankırı / Türkiye