ERZİNCAN – PT3 MEASUREMENT STATION

ERZİNCAN – PT3 MEASUREMENT STATION

ERZİNCAN – PT3 MEASUREMENT STATION

GREENHYDRO successfully completed GRE pipeline installation at the Erzincan PT3 (Çayırlı) Metering and Pump Station within the BOTAŞ pipeline project. The scope included manufacturing 80 adhesive taper joints and spools, completing the emergency fire line installation, and passing hydrostatic tests successfully. The system is critical for fire safety and demonstrated high leak tightness and pressure resistance in all test results. After the 2023 Kahramanmaraş earthquake, inspections confirmed the line continued operating at full capacity without structural damage—once again demonstrating GREENHYDRO’s engineering capability in designing durable and reliable piping systems.

Project Name

Erzincan - Botaş PT3 Measurement Station

Partner Company

Enka İnşaat

Services

GRE Pipe Installation

Project Date

2022

Project Duration

3 Month

Project Location

Çayırlı / Erzincan / Türkiye