GREENHYDRO successfully completed GRE pipeline installation works at the Kahramanmaraş IPT1 Metering and Pump Station within the BOTAŞ pipeline project. During the project, 138 adhesive taper joints and spools were manufactured, followed by installation and commissioning of the emergency fire line. The installed system plays a critical role in fire safety and successfully passed all pressure and leak-tightness tests. The infrastructure withstood the two major Kahramanmaraş earthquakes in 2023 without damage, demonstrating the system’s engineering quality and long-term reliability.
With our technical know-how, experience and expert team, we continue to be a reliable solution partner for our project stakeholders in Türkiye and abroad. We closely follow industry developments and implement them in our field operations to deliver cost-effective, long-lasting and functional solutions.