Within the Adana İmamoğlu Irrigation Project (Phase 3), GREENHYDRO successfully completed on-site installation of a DN3800 mm GRP (FRP) pipeline, fittings manufacturing, and Lamination applications. During the project, 600 fittings were produced and 1,200 lamination applications were performed. The entire system successfully passed comprehensive pressure and leak-tightness tests and was commissioned. The project established a high-capacity, long-lasting and reliable water transmission infrastructure that will cover a significant portion of the region’s agricultural irrigation needs.
With our technical know-how, experience and expert team, we continue to be a reliable solution partner for our project stakeholders in Türkiye and abroad. We closely follow industry developments and implement them in our field operations to deliver cost-effective, long-lasting and functional solutions.