GREENHYDRO successfully completed GRE pipeline installation at the Erzincan PT3 (Çayırlı) Metering and Pump Station within the BOTAŞ pipeline project. The scope included manufacturing 80 adhesive taper joints and spools, completing the emergency fire line installation, and passing hydrostatic tests successfully. The system is critical for fire safety and demonstrated high leak tightness and pressure resistance in all test results. After the 2023 Kahramanmaraş earthquake, inspections confirmed the line continued operating at full capacity without structural damage—once again demonstrating GREENHYDRO’s engineering capability in designing durable and reliable piping systems.
With our technical know-how, experience and expert team, we continue to be a reliable solution partner for our project stakeholders in Türkiye and abroad. We closely follow industry developments and implement them in our field operations to deliver cost-effective, long-lasting and functional solutions.