GREENHYDRO successfully completed the repair and Lamination works for DN2800 mm GRP (FRP) pipelines within the Aydın Bozdoğan Irrigation Project. Under the project scope, 198 uniaxial lamination applications were carried out, and all lines were systematically tested and commissioned. This work improved the mechanical strength and leak tightness of the existing lines, ensuring long-term system reliability. By using project-specific resins and reinforcement materials suitable for site conditions, GREENHYDRO delivered a high-quality solution in line with international GRP repair standards.
With our technical know-how, experience and expert team, we continue to be a reliable solution partner for our project stakeholders in Türkiye and abroad. We closely follow industry developments and implement them in our field operations to deliver cost-effective, long-lasting and functional solutions.