ENKA - ERZİNCAN IPT3 Metering Station GRE Piping

  • Within the scope of the BOTAŞ BAKU-CEYHAN-TIFLIS oil pipeline project, pressure adjustment stations were constructed in Erzincan and Kahramanmaraş on the pipeline.

  • GRE Pipe Installation has been made within the Emergency Fire Extinguishing Lines within these stations.
  • The missing parts in the project were manufactured in the workshop and the lines were completed and successfully passed the hydrostatic test.

  • All GRE lines installed in the project were not affected by the devastating earthquake on February 6, 2023.

Service:

GRE Piping

Architect:

ENKA - ERZİNCAN IPT3 Metering Station GRE Piping

Duration:

2022-2023

Location:

Erzincan / Turkey